The Ras Al Khaimah casino forms part of Wynn Al Marjan Island on Al Marjan Island, but it was not open to the public on 10 August 2026. Wynn's latest published guidance puts the resort's guest opening in September 2027.
This panel distinguishes finished milestones from planned work and attaches a date to each time-sensitive figure. Since the opening and operating details may move, every row uses the latest official reference available.
| Entry | Verified status | Source date |
|---|---|---|
| Resort status | Under construction and not open for visits | 10 August 2026 |
| Opening date | September 2027 | Wynn results, 4 August 2026 |
| Licence | Island 3 AMI FZ-LLC, trading as Wynn Al Marjan, is listed by GCGRA | Current GCGRA register |
| Tower | 70 floors, with a final planned height of 352 metres above sea level | Current resort website |
| Accommodation inventory | All 1,530 units structurally complete | 2 February 2026 |
| Gaming area | 225,000 sq ft, about 20,900 sqm | Wynn 2025 annual filing, March 2026 |
A construction site cannot accept bookings for rooms, restaurants or the gaming floor. Wynn currently provides an email update form, though submitting it does not reserve a room or grant admission.
Wynn Al Marjan Island will be Wynn's first integrated resort in the Middle East and North Africa, and its developers call it the UAE's first. The single destination is planned to bring together a hotel, licensed gaming facility, dining, entertainment, retail, spa, beach, marina and events centre.
Facing the Arabian Gulf, the project occupies more than 60 hectares on Al Marjan Island in Ras Al Khaimah. It is a joint venture between entities linked to Wynn Resorts, Marjan and RAK Hospitality Holding; the gaming licence register names Island 3 AMI FZ-LLC.
This is more than a gaming floor beside a hotel. Published plans and updates focus largely on accommodation, restaurants, beach facilities, events and entertainment, while Wynn has not yet set out the detailed game mix.
Wynn stated in its second quarter results on 4 August 2026 that guests are due to enter the resort in September 2027. That is the latest named month, replacing references that say only 2027, first quarter 2027 or spring 2027.
Earlier investor updates pointed to the first quarter of 2027. After Wynn mentioned a modest delay in May 2026 without yet quantifying it, the August release supplied the revised guidance: September 2027.
A results release carries more weight than a property listing or travel blog, yet it remains forward-looking guidance while the resort is being fitted out. Check the official resort website and Wynn investor releases before paying for a non-refundable trip.
Reading the announcements chronologically keeps an earlier target separate from the current one. The sequence follows the Ras Al Khaimah casino from proposal through licensing and construction to its named opening month.
| Recorded date | Milestone reached | Meaning |
|---|---|---|
| 25 January 2022 | Joint project announced for Al Marjan Island | The concept began with preliminary scope and timing |
| 4 October 2024 | Wynn announced receipt of the commercial gaming facility operator licence | The project became the UAE's first licensed commercial gaming facility |
| 25 November 2025 | A site ceremony marked the 70-floor hotel tower reaching its top | The main tower hit a visible construction milestone |
| December 2025 | Wynn's later updates recorded structural concrete completion | Work shifted further into the crown, facade and interior phases |
| 2 February 2026 | Facade reached 83%, all accommodation units were structurally complete and Wynn Bridge reached 48% | This remains the newest detailed construction percentage release |
| 11 March 2026 | Construction resumed after a short pause | This was a status update, not an opening or cancellation notice |
| 29 June 2026 | Wynn announced an original theatre production with Punchdrunk | The opening entertainment programme gained a confirmed headline show |
| 15 July 2026 | Wynn's investor presentation showed extensive interior work in progress | The latest visual snapshot verified the fit-out phase was active |
| 4 August 2026 | September 2027 was named for opening the doors | This is the current official date to use for planning |
A Wynn project story places the 70-floor ceremony on 25 November 2025, whereas later corporate updates place the structural concrete milestone in December 2025. The timeline keeps November for the ceremony and December for the later construction record instead of collapsing the two references.
In its 2 February 2026 release, Wynn reported structural concrete complete through the roof of level 71 and 21,852 of 26,471 facade panels installed, or 83%. The guest website still calls it a 70-floor tower. Wynn has published varying interim height measurements, while the lasting target is 352 metres above sea level once the spire is fitted, so the descriptions remain separate.
Lift and escalator installation was advancing, alongside mechanical, electrical and finishing work throughout the guest inventory. Concrete and structural steel for the low-rise buildings had reached 99%, but that percentage does not make those spaces guest-ready.
Wynn Bridge, measuring 548 metres, is intended to link the resort via Wynn Boulevard with E311 and E611. On 2 February 2026 it was 48% complete: piling was finished and nine of ten bridge-column pile caps were in place, with Wynn targeting completion in late 2026.
Wynn's August results described rapid construction progress, and its second quarter presentation showed extensive interior work on 15 July 2026. Neither source added a facade or bridge percentage, so the February figures remain dated rather than being extended through speculation.
Wynn's 2025 annual report, filed in March 2026, records a gaming area of 225,000 sq ft. That is about 20,900 sqm, and this guide uses it because the figure comes from the latest direct corporate filing.
Older property and news reports, including current search results, often give an approximate 18,500 sqm gaming floor. Wynn has not explained whether the measurements cover different spaces, so 18,500 sqm remains an older estimate and is not combined with the newer figure.
| Measure | Figure shown | How to interpret it |
|---|---|---|
| Gaming area | 225,000 sq ft, about 20,900 sqm | Latest figure in Wynn's annual filing |
| Older figure still repeated online | About 18,500 sqm | Legacy estimate, not the current lead figure |
| Development site | More than 60 hectares | The whole integrated resort, not only the gaming floor |
| Hotel tower | 70 floors | Current guest-facing description |
| Structure in the February update | 299 metres through the level 71 roof | A dated construction measurement, not final height |
| Planned height with spire | 352 metres above sea level | Final architectural target on the resort website |
A floor measurement says nothing about the number of tables or slots, the game mix, or the split between general and private rooms. Wynn had not published those details by 10 August 2026, so a precise inventory requires a newer operator source.
Wynn's February construction update reported structural completion for all 1,530 accommodation units, although interior fit-out continued. The categories below remain within that total, preventing the apartments, townhomes and estates from being counted again.
| Category | Number | Published detail |
|---|---|---|
| Resort rooms | 1,217 | Rooms and suites in the main Resort Tower |
| Enclave suites | 297 | A hotel within a hotel on the upper floors |
| Royal Apartments | 2 | Two apartments at the top of the tower |
| Garden Townhomes | 4 | Standalone garden accommodation in the resort plan |
| Marina Estates | 10 | Residences beside the marina |
| Total | 1,530 | Current announced guest inventory |
Enclave is Wynn's hotel-within-a-hotel arrangement on the upper floors, with a dedicated entrance, arrival area and lifts. It is centred on suites and a separate service setting, while rates, packages and the reservation opening date remain unannounced.
Older Wynn releases introduced the 1,542 figure, which competitors still repeat. The February 2026 construction release and current resort materials give a complete category breakdown totaling 1,530, the figure used here.
The current resort website lists plans for 22 restaurants, bars and lounges, as well as a daytime beach club serving guests and visitors. Wynn has identified a French-American steakhouse by Alain Ducasse and another Delilah supper club, but restaurant bookings were not open at this update.
Wynn announced an original Punchdrunk production on 29 June 2026 for the resort's debut. Once bookings begin, guests are expected to choose between a seated upstairs performance and a roaming immersive route downstairs and backstage; show dates and prices remain unreleased.
The plans call for a naturally lit shopping parterre for luxury brands, although Wynn has not issued the complete shop list. Art will appear across public areas and guest rooms, with announced highlights such as Jeff Koons' 11-metre Tulips and historic and contemporary works by regional and international artists.
The resort plan provides for 420 metres of private white-sand beach and a deep-water marina for large yachts. It also includes a daytime beach club, though day-pass and non-guest access rules have not been published.
Wynn lists 12 pools, cabanas and landscaped areas, plus a five-star spa, salon and fitness centre. Treatment prices, operating hours and pool admission conditions are still unavailable, leaving them out of any reliable visit budget.
The official amenities list pairs a kids' club with outdoor recreation, indicating that the resort's non-gaming spaces are designed to welcome families too. Ages, fees and supervision arrangements are not yet published, so childcare planning should wait for the guest policy.
Coral Court will serve as the resort's events and celebrations centre, covering a published 7,708 sqm. Its plan includes six reconfigurable meeting rooms, separate salons for brides and grooms, and private prayer rooms for men and women.
The Grand Ballroom spans 2,633 sqm, is column-free and looks over the marina. Organisers can use the measurement to compare venues, but it does not set capacity because tables, stages, aisles and production equipment change the seating plan.
By 10 August 2026, Wynn had not released venue packages, prices or minimum spends. When sales open, ask for written capacity details and a quote covering production, catering, cancellation and accessibility rather than deriving attendance from floor area.
Al Marjan Island in Ras Al Khaimah, rather than Dubai, is the resort's location. Wynn's website estimates about 15 minutes by car from Ras Al Khaimah International Airport, while a 2025 Wynn financing release put the Dubai International Airport drive at roughly 50 minutes.
| Origin or route | Published detail | Planning note |
|---|---|---|
| Ras Al Khaimah International Airport | About 15 minutes by car on the resort website | Review the journey time on arrival day because traffic changes |
| Dubai International Airport | About 50 minutes in Wynn's 2025 release, with the resort less than 50 miles away | Add baggage and traffic time rather than treating the estimate as a guarantee |
| Wynn Bridge | Planned link through Wynn Boulevard to E311 and E611 | Late 2026 was the completion target, so verify that the route is open |
| Resort shuttle | No operating timetable or fare published | Do not plan around a service the operator has not announced |
| Parking and valet | Final operating details not published | Check arrival instructions when reservations open |
The 548-metre bridge should give the resort a more direct connection to the wider road network, but the latest detailed release still treated it as construction. Wait for a completion announcement or a current mapping service to verify the route before treating it as open.
Once bookings open, confirm the final drop-off because the hotel, events centre and marina may have separate entrances. Build in spare time and pay for a transfer only when it appears in written reservation verification.
The GCGRA licensee register names Island 3 AMI FZ-LLC, trading as Wynn Al Marjan, among land-based gaming facilities. On 4 October 2024, Wynn announced that the project entity had received the UAE's first commercial gaming facility operator licence.
The register verifys a GCGRA licence for this named land-based facility. It lists The Game LLC separately as the UAE Lottery operator, illustrating the distinction between land-based facilities and lottery products. Wynn Al Marjan is set to become the first licensed casino in the Gulf Cooperation Council when it opens; wider regulation is discussed on our UAE gambling laws page.
Before players are admitted, Wynn should publish the gaming floor's final age, identity, admission, responsible gaming and complaints arrangements. Rules from other Wynn properties do not apply here unless this resort publishes them.
Resort operating details often shift in the months before opening. Separating unknowns from verified figures helps prevent an email registration, design image or third-party offer from being read as a booking or operational commitment.
| Detail | Status as of 10 August 2026 | Recommended action |
|---|---|---|
| Hotel bookings and room rates | Reservation date and prices not announced | Subscribe to official updates and wait for Wynn's booking engine |
| Restaurant reservations | Not open on Wynn's dining page | Avoid paying an unverified intermediary for a table |
| Casino game list | Table, machine and title counts not published | Look for the operator's gaming information |
| Betting limits | Minimum and maximum stakes not published | Do not substitute limits from Wynn Las Vegas |
| Age, ID and admission charges | Final Wynn conditions not published | Check Wynn and GCGRA before making the trip |
| Dress code and opening hours | Not published | Review the guest guide when it appears |
| Shuttle, parking and valet | No operating timetable or pricing published | Ask for verification with the hotel booking |
| Theatre tickets | Interest registration available, schedule and prices incomplete | Do not treat registration as a ticket |
Wynn's website collects email addresses and interests for news and early updates. It does not hold a room, restaurant or theatre seat, nor does it set a price or priority without separate booking verification.
Use the resort website first, compare the licence with the GCGRA register, then compare the opening date with Wynn's newest investor release. When an official channel omits a detail, record it as unannounced rather than borrowing another resort's policy.
This page and its gaming content are intended for adults aged 18 and over. GCGRA advertising standards classify anyone below 21 as underage for commercial gaming other than lottery. Wynn had not issued final gaming-floor identity and admission rules by this update, so check them before travelling and do not treat hotel access as access to every resort area.
For illustration, imagine a future one-day entertainment budget of 800 United Arab Emirates dirhams (AED), not a Wynn price. Reserve AED 500 for transport, food and contingency, and set AED 300 as the firm gaming ceiling whatever the outcome.
Choose the spending limit and finishing time before entering the gaming area, leaving extra cards and funds outside the plan. Once either limit is reached, leave instead of transferring contingency money to a new stake or chasing a loss.
Stop when gaming brings hidden spending, borrowing, anxiety, or neglect of work and relationships. Our responsible gambling guide covers warning signs, a stopping plan and support options in more detail.
The answers below reflect published information available on 10 August 2026. Recheck the opening date and entry terms when reservations begin because future operating details may change.
No. Construction is still under way, and Wynn said on 4 August 2026 that guest arrivals are planned to begin in September 2027.
The latest guidance from Wynn is September 2027. Its second quarter results on 4 August 2026 gave that month, replacing the earlier first quarter and spring 2027 indications.
Al Marjan Island in the emirate of Ras Al Khaimah is the resort's location, rather than Dubai. Wynn puts Ras Al Khaimah International Airport at about 15 minutes by car.
Wynn's newest annual filing gives 225,000 sq ft, or about 20,900 sqm. Older project coverage uses an approximate 18,500 sqm figure, so this guide follows the newer company filing.
The announced total is 1,530 accommodation units: 1,217 Resort rooms, 297 Enclave suites, two Royal Apartments, four Garden Townhomes and 10 Marina Estates.
GCGRA, the General Commercial Gaming Regulatory Authority, issued the licence to Island 3 AMI FZ-LLC, trading as Wynn Al Marjan. Wynn announced the UAE's first commercial gaming facility operator licence for it on 4 October 2024.
By 10 August 2026, Wynn had not announced a hotel reservation opening date, and its dining page said restaurant bookings were still closed. An email-list subscription is not a booking and promises neither a rate nor priority.
As of 10 August 2026, Wynn had released no table game list, slot count or betting limits. Use the operator's future gaming information and entry terms instead of borrowing details from another Wynn resort.
Wynn estimates about 15 minutes by car from Ras Al Khaimah International Airport and has previously put the drive from Dubai International Airport at about 50 minutes. Traffic affects both estimates, and Wynn's February 2026 update still described Wynn Bridge as under construction.
GCGRA advertising standards treat anyone under 21 as underage for commercial gaming other than lottery. Wynn had not published final gaming-floor ID and admission rules by 10 August 2026, so check Wynn and GCGRA terms before travelling.